The George Snyder Trail Controversy: “Oh, what a tangled web we weave, ….”
The rationale for building an over $21.M, 1.7-mile through-the-woods George Snyder Trail (GST) is falling apart. Initially, the purpose of the GST was to get people from Point A to Point B and support local businesses along Fairfax Boulevard. How does a through-the-woods trail away from businesses do that? How does the less expensive alternative design concept, which creates a shared-use path along Eaton Place and Fairfax Boulevard, not do that?
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed